West Chester YMCA Loves PowerVent™

Posted November 14, 2011 by

 

When Miller Flooring told the owners at the West Chester YMCA that moisture issues are inevitable in nearly all floors, it is certain that no one was predicting disaster.  But that’s why we install the ScissorLoc™ II with the PowerVent™!

An accident occurred at the West Chester YMCA basketball floor in September, when a ball hit a sprinkler head, causing more than 1,000 gallons of water to flood the area.  The YMCA was smart to call Miller Flooring, who then worked with a local disaster restoration company to get the water out of the gym.  Then, with commercial fans placed into the gym, and the under floor humidistat combined with the air-blowing action of the PowerVent™ in the subfloor, the floor was on its way to being completely dried out!

Within a month, the floor at the West Chester YMCA was ready for use again, and not a single board was replaced.  This is why we fully believe in ScissorLoc™ with PowerVent™, and now, so does the West Chester YMCA! Miller Flooring www.millerflooring.com

MFMA ASBA NWFA USGBC FSC RAC AIA WSF FIBA BWF
CLOSE